However the limit on total deflection is span 720 resulting in the need for total deflection to be only 0 50 half of the 1 00 value for span 360.
Floor joist supportfor tile. The floor framing for bathtubs requires special attention. A standard bathtub can hold between 40 and 60 gallons of water. True floor joist span calculations can only be made by a structural engineer or contractor. If the floor was built using the general 16 inch spacing you can expect a bathroom floor to safely hold 40 psf.
Also when installing the joist supports you need to make sure that they are level. Tile over wood subfloor. Cut 1 5 extra on the beam side and 3 extra on the other side. However you should take a little extra time to double check to make sure that they are all level.
In this scenario jim and rich install 1 2 cementious backer unit cbu resulting in at least an 1 1 8 thick. 3 cut out the joists under the area to be lowered. In extreme cases jim and rich have advised additional joists be put in place. This provides sufficient support for most cast iron bathtubs which run under 500 pounds even when full.
This sample table gives minimum floor joist sizes for joists spaced at 16 inches and 24 inches on center o c for 2 grade lumber with 10 pounds per square foot of dead load and 40 pounds of live load which is typical of normal residential construction. They are covered with subflooring panels of plywood or oriented strandboard osb to complete the floor s structural assembly and create the solid continuous platform on which you install tile carpet or other finish flooring. 4 add a single 2x10 header between the doubled joists to carry the 1 stub joists from the beam. Planning on laying tile in our house.
Attach joists using joist hangers the project shouldn t take you more than a few hours. Plywood and osb are the two most common materials used for floor decking and typically they are 5 8 or 3 4 thick. So a 5 by 10 foot bathroom floor generally supports up to 2 000 pounds. Now consider the same floor joist supporting stone tile flooring such that floor dead load is now 20 psf.
Hi a question regards setting out velux windows on a new extension roof basically do the velux s have to be spaced out so that the tiles fit as either a full or half tile to the edges of the velux. Joists are spaced at regular intervals much like the studs in a wall frame. You must consider all of the weight the floor joists must be able to support. We re putting down cement backer board and then ceramic tile.
2 temporarily support the 3 joists that pass under the shower pan area on either side of that area. The tiles are 7in x 20in.