People then proceed to restore their room and add new flooring.
Flooring installation delayed for slab to dry. For best results several areas of each room should be tested for excess moisture. Therefore it s important to allow concrete to dry out before you install flooring on a newly poured slab. When conducting slab moisture testing conduct tests in several areas regardless of the age of the slab. A new moist slab should be allowed to dry naturally or the process can be hastened.
If tests indicate too much moisture is in the slab do not install hardwood floors. Not too soon after they start to have problems with the new flooring and claim it is defective. Determine how much flooring and materials will be needed. Remove any carpet or other flooring.
More time was needed for the concrete to dry. Laminate flooring is a good alternative to wood flooring in basements. The use of an electronic concrete moisture meter to determine slab moisture emission is not reliable nor recommended. Supplied with accurate knowledge of a slab s rh condition the general contractor and flooring installer will know whether to allow for more drying time to reach adhesive flooring specifications or to choose a different flooring adhesive flooring product which is compatible with the slab s current conditions.
For a standard four inch thick concrete slab this takes four to five months to happen naturally. Typical ceramic tiles are a common sight in many homes but some homeowners choose to install parquet flooring as an alternative. Add about 10 to that number to account for any possible mistakes and warped boards. The results indicated the floor was too wet to safely install flooring.
Laminate flooring is also fairly easy to install. If the testing indicates a wet slab document the results and delay installation of the flooring until corrected. Too much humidity is most likely to be a problem for a newly installed slab but it could also be an issue for existing slabs too. However proper concrete floor water damage repair presents unique challenges.
How to glue solid parquet flooring directly to a concrete slab. If it s left uncovered water vapor can rise through the slab and evaporate away at the surface. When inexperienced contractors dry the walls and contents concrete floors are often assumed to be dried. Multiply length times width of the room.
If you have a vinyl floor you may be able to install your flooring directly on top of it. The concrete slab needs to be dry before any flooring can be installed. Prior to installing the flooring we did our due diligence by performing a relative humidity rh test on the concrete which involved inserting an rh probe to a depth of 40 in the slab. Many types of flooring can be installed over a concrete sub floor.