Floor Prep For Concrete Overlay

If you have a concrete garage floor driveway sidewalk or patio that is starting to show its age you are left with two options.
Floor prep for concrete overlay. Preparing concrete surfaces for coatings overlays stains or repair materials is a time consuming task that many contractors perform begrudgingly or are tempted to overlook altogether. Or you can use a resurfacing process to restore the slab to its youthful appearance. For surface preparation wear heavy boots and protective glasses and blast off surface dirt with a gas powered pressure washer that can reach at least 3 500 psi. From a simple resurfacing to something quite decorative the possibilities are amazing.
You can demolish and remove the old surface prepare the base and pour a new slab. Fit the wand with a 25 degree fan tip and hold it 6 to 8 inches from the surface as you clean the concrete with slow even sweeps. How to install a concrete floor overlay. Typical sight lines run parallel to the longest wall but each home is different.
Being a concrete contractor since the early 80 s i ve seen a lot of concrete that needs a new surface. Overlays can also be placed over other flooring materials such as vinyl tile or wood. Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight. Test the floor for moisture.
The products range from very thin layers to 2 inch thick overlays with unlimited decorative finishes. Fix a pitted garage floor special concrete resurfacers will make a concrete floor look like new every editorial product is independently selected though we may be compensated or receive an affiliate commission if you buy something through our links. A concrete overlay can give your ugly concrete patio floor or pool deck a makeover. Measure and mark the center of all four walls at floor level.
With the advent of overlays micro toppings that are spray on trowel down self leveling and stampable interior concrete floors are both a desirable first choice and a solution to restore or enhance an existing concrete floor. Leave the vinyl in place for 72 hours. To remove mildew or algae use a concrete wash.